| 
Turn left to join Nest Road then right uphill passing paint factory / car park to next T.jcn
Turn left and continue straight ahead to end of road (dead end) - pass through bollards and take left hand path downhill to join a rough lane. At bottom bear right onto rough riverside track.
 |
Link to Heworth Metro / Bus Interchange and East Gateshead Cycleway
At bollards bear right following fence to Heworth Lane - bear right uphill then join path leading to car park and through underpass to Interchange. |
At
end of rough track - through bollards / boulders to join tarmac parth
- follow this along riverbank then behind factory (L) until at bollards
join Jonadab Road.
At
junction jink left - right to join off road track, passing scrapyard (L)
Beware the Jack Russel guard dog chained outside !! He is noisy but he
can't reach you !!!!!
Remain
on this track as it winds its way high up along the riverbank before veering
away from river uphill to a track junction.

View of River Tyne from Bill Quay
You
now pass into South Tyneside
NCN 14 continues down river to the Ferry landing at South Shields via Hebburn and Jarrow.
Click sign for link to the Three Rivers web site for guide notes and maps plus other cross river links.
 |
Links 1 and 2 to Team Colliery Waggonway and Bowes Railway Path |
 |
Back up river to Blaydon |
 |
Continue down river to South Shields
(Link to Three Rivers web site which will open in a new window) |



|